PROQUEST AND ITS LICENSORS SPECIFICALLY DISCLAIM ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES FOR AVAILABILITY, ACCURACY, TIMELINESS, COMPLETENESS, NON-INFRINGMENT, MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. The translations are automatically generated "AS IS" and "AS AVAILABLE" and are not retained in our systems. Neither ProQuest nor its licensors make any representations or warranties with respect to the translations. This functionality is provided solely for your convenience and is in no way intended to replace human translation. You have requested "on-the-fly" machine translation of selected content from our databases. Results of the work are good prerequisites to the implementation of BIM in design field in Russia. Using the same algorithm to solve the problem we produced almost identical results. It allowed the proceeding to the next stage - modeling a whole structure of the project. Comparison of three approaches has given the identical results. The calculation and analysis of the load-bearing structure of the object: manual, Scad office and Robot Structural Analysis Professional. As the object of analysis was selected the real project of the car center «SCANIA». The logical solution to this problem is comparing the calculation results of the new technology and the traditional approach to the calculation of buildings and structures in Russia. The main problem with the new technology is the extent of the compliance and the adequacy of the results to reality. BIM is impossible to implement in a short time because it requires a complete re-equipment of the company, retraining staff, experience and knowledge. That is why it introduced the new project about the phased implementation of BIM (December 2014). Russian government is aware of the need for BIM (Building Information Modeling) in its building projects.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |